What's inside
Six decision areas architects miss at Stage 2
The Future Homes Standard goes live March 2027. These are the decisions that can't wait until Stage 4.
Heating & Hot Water
The most consequential Stage 2 decision. Gas boilers are non-compliant under the Future Homes Standard (ADL1 2026). This section covers heat pump specification, cylinder sizing, and client briefing.
Thermal Fabric
FHS notional values are tighter than Part L 2021: wall ≤0.15, roof ≤0.09, floor ≤0.11 W/m²K. Set these early — they drive structure, build cost, and planning.
Airtightness
An airtightness target below 5 m³/h·m² needs to be designed in, not tested in. This section covers the airtightness layer, service penetrations, and party wall strategy.
Ventilation
MVHR is the expected FHS ventilation strategy. Duct routes and unit location need coordinating before structure is fixed — this is the section that prevents late-stage surprises.
Solar & Renewables
FHS expects ~40% renewable energy contribution. This section covers PV sizing, south-facing roof area, battery storage, and DNO capacity — all Stage 2 decisions.
Early Modelling
Catching a TER vs DER failure at Stage 2 costs hours. At Stage 4, it costs months. This section covers when to commission SAP 10 / HEM and what to do with the results.
Common pitfalls
What trips architects at Stage 2
"We'll switch the heating system later"
Gas boiler designs that retrofit to heat pumps need structural changes, cylinder space, and often larger radiators. Stage 4 specification changes are rarely cheap.
No MVHR duct space until Stage 3
MVHR duct routes need to be in the structure. Coordinating at Stage 3 means compromises. The checklist shows you what to fix in Stage 2 drawings.
Skipping PV until planning is approved
FHS solar contributions need south-facing roof area and structural load design. Coordinatingafter planning approval creates roof geometry conflicts that are expensive to resolve.
Assuming SAP 10 will pass without modelling
FHS primary energy and CO₂ targets are significantly tighter than Part L 2021. Early indicative modelling at Stage 2 catches failures when they're still design decisions.